Saudi Aramco Schedule G Jun 2026
Contractors must provide regular, detailed reconciliation reports to Saudi Aramco. These reports include quantities received, installed, stored, and any damaged or unusable items.
One of the most heavily audited segments of Schedule G relates to labor camps. Saudi Aramco enforces the Contractor Workforce Accommodation Standards (CWAS) to ensure humane, safe, and hygienic living conditions. Schedule G mandates:
For a potential bidder, the first engagement with Schedule G is in the initial tender documents. It is crucial to carefully review all its requirements to assess the full scope, cost, and feasibility of the material supply.
Saudi Aramco’s Schedule G dictates material management, procurement, and technical standards for contractors, emphasizing compliance with Saudi quality standards and local procurement. In offshore contexts, it specifically covers rigorous upgrades for helidecks, piping, and mooring gear, often requiring specialized shipyard support to meet Aramco Marine Department requirements. Further technical details can be reviewed in the Scribd document . Offshore Drilling Rig ADM-683 Specifications | PDF - Scribd
Contractors may be penalised if they fail to comply with these local sourcing requirements. Standard Attachments saudi aramco schedule g
Schedule G is usually supplemented by:
Given the complexity and stringency of Schedule G, contractors should adopt the following best practices:
Aramco regularly buys long-lead, high-value components directly—such as specialized line pipes, heavy valves, or control systems—to prevent project delays. Schedule G defines these items in an explicit document known as .
, this schedule dictates exactly how those assets must be managed. What is Saudi Aramco Schedule G? It is a spiderweb of cross-references
Contractor materials must explicitly meet Saudi Arab Standards and achieve total cross-functional interchangeability with existing Aramco systems.
| Schedule | Content | |----------|---------| | A | Scope of Work / Specifications | | B | Price & Payment Schedule | | C | Delivery / Performance Timeline | | D | Special Conditions (project-specific) | | | General Commercial Conditions |
Work cannot proceed beyond this point without an Aramco inspector present.
The contractor is fully responsible for protecting, preserving, and maintaining these items from receipt until project completion. Reporting: Engineering Standards (SAESs)
This rigorous process is guided by the and General Instructions (GIs), which mandate compliance and a "zero harm" culture. The Project Execution Plan (PEP) is another master reference that aligns all project participants, covering everything from objectives and contracting plans to project milestone schedules. All of these elements work in concert to ensure success.
A systematic approach to assessing risks associated with specific site activities. 3. Permit to Work (PTW) System
Even though these are general materials, Aramco’s Vendor Inspection Group (VIG) may assign a or Cat-IV inspection level.
Formally titled (Form 175), Schedule G translates Saudi Aramco’s corporate safety policy (GI 2.100) into operational mandates. It is a spiderweb of cross-references, pulling requirements from dozens of other Saudi Aramco Engineering Procedures (SAEPs), Engineering Standards (SAESs), and General Instructions (GIs).